Eugene cannot grow out very far. The urban growth boundary limits new land, so most investor building happens on infill lots inside the city. Oregon's middle housing law changed what those lots can hold, and duplexes, triplexes, fourplexes and cottage clusters are now on the table in many neighborhoods that once allowed only one house.
In short: LendingStreet finances ground-up construction of 1-8 unit investor properties in Eugene, Springfield and Lane County, including spec homes, build-to-rent houses, middle housing infill and small 5-8 unit buildings. Loans are sized on loan-to-cost with terms set per project, and funds are released through a draw schedule after inspections. Approved plans, permits, a realistic budget and builder experience drive approval.
Oregon's 2019 middle housing law requires larger cities, including Eugene and Springfield, to allow duplexes on residential lots and to allow triplexes, fourplexes, townhouses and cottage clusters in many residential areas, subject to local siting and design standards. Companion rules also make it possible to divide some middle housing projects onto separate lots.
For investors, that opens two paths. One is to build a small rental building on a lot that used to take a single house, spreading land cost over several rents. The other is to build townhouse-style units that can be sold separately. Each city writes its own standards for setbacks, parking, height and lot size, so confirm what your lot allows with the City of Eugene or Springfield before you buy it.
These are the residential investor projects we review. Every one is underwritten on its own plans, budget and exit.
| Project | Typical Eugene setting | Key review item |
|---|---|---|
| Spec single-family | Infill lots, edge-of-city subdivisions | New-home resale comps |
| Build-to-rent house plus ADU | Older neighborhoods with deep lots | Market rent for both units |
| Duplex to fourplex infill | Middle-housing-eligible residential lots | Zoning, design standards, utilities |
| Townhouses for sale | Lots that can be divided | Lot division approval, sales comps |
| 5-8 unit building | Multi-family zoned parcels near campus or corridors | Plans, budget, builder record |
This example is illustrative and not a quote. An investor buys an infill lot in a middle-housing-eligible neighborhood for $215,000 and builds a two-story fourplex. Hard costs are $905,000 and soft costs, including design, engineering, permit fees and system development charges, are $148,000, for a total of $1,268,000. The loan is sized at 80% of cost, $1,014,400.
When the building is finished and leased at about $2,050 per unit, $8,200 a month, it appraises at $1,390,000. Eugene's price-to-rent ratio keeps the takeout conservative: a DSCR loan at 65% of value, $903,500, carries estimated principal and interest of $6,011. With taxes of $950 and insurance of $380, the payment is about $7,341 and DSCR is about 1.12x. The investor leaves some equity in the building, which is typical for new construction here.
| Draw | Amount |
|---|---|
| Land and closing | $172,000 |
| Site work and foundation | $126,700 |
| Framing, roof and windows | $253,400 |
| Rough-ins and inspections | $181,000 |
| Insulation, drywall, siding | $162,900 |
| Finishes, final and occupancy | $181,000 |
| Total loan | $1,014,400 |
Fees are one of the biggest differences between building in Eugene and building in a lower-cost market. New units in Eugene and Springfield pay system development charges for transportation, parks, water and wastewater, and those charges add up quickly on a multi-unit project. Building permit and plan review fees, utility connection costs and any school construction excise tax also belong in soft costs. Ask the city for a current fee estimate on your exact plan before you lock the budget, because fees are calculated per unit or by size.
Some fee programs offer reductions or deferrals for certain housing types, such as smaller units or ADUs. Programs change, so ask the city what applies to your project and whether any reduction affects the timing of payment.
Oregon requires construction contractors to be licensed with the Construction Contractors Board. Projects without plans or permits, or a borrower with no build track record and no experienced general contractor, usually do not qualify.
Rain changes construction schedules here. Excavation and foundation work can stall on saturated soils, framing needs protection, and some exterior finishes cannot go on in wet conditions. Experienced Eugene builders plan to get a project dried in before the heaviest rain, then work inside through winter.
That rhythm affects your draws and your interest cost. A project that breaks ground in October may move slower than one that starts in May, so the loan term and your carry budget should reflect the season you start in. Ask your builder for a month-by-month schedule that shows when each draw is expected, then check it against the draw schedule calculator so you know how much interest will accrue before the building is leased.
Under Measure 50, new construction is added to the tax roll using a ratio applied to the market value of the new improvements, so a finished building will carry a higher bill than the vacant lot did. Ask the Lane County assessor how new value is added and budget on a realistic finished tax figure when you run the DSCR math for your takeout loan.
Build-to-rent projects usually refinance into a DSCR loan once leased; five or more finished rentals can move into a blanket portfolio loan. Newly built units are exempt from Oregon's annual rent cap for their first 15 years, which gives a new building more flexibility on rent than an older one in the same neighborhood. That exemption is set by state law, so confirm the current rule when you plan your rents. Townhouses or divided units can be sold individually. Send plans, budget, lot details, builder information and your exit through the form below, or call (877) 298-1001. The draw schedule calculator helps map funding to your timeline, and our Oregon construction page covers statewide terms.
On loan-to-cost. The loan covers a share of land, hard costs and soft costs, with terms set per project.
Often yes under Oregon's middle housing law, subject to the city's siting and design standards. Confirm your specific lot with the City of Eugene.
Yes. SDCs, permit fees and utility connections are soft costs and should be in the budget used for loan-to-cost sizing.
Yes. Oregon requires a Construction Contractors Board license. We review the builder's track record on similar projects.
Through a draw schedule. An inspector confirms each stage of work before funds for that stage are released.
Usually only with an experienced licensed general contractor whose record supports the project.
You refinance into a DSCR loan once it is leased, sell it, or sell divided units separately.
Some Lane County projects, yes. Rural lots on wells or septic get extra review and do not fit every program.