Construction · Ogden, UT

Ground-Up Construction Loans Around Ogden

Western Weber County has some of the fastest home building in northern Utah, with farmland in West Haven, Plain City, Farr West and Hooper turning into subdivisions. Closer in, infill lots in Ogden and bench lots in North Ogden bring their own challenges.

Get a quote →

In short: LendingStreet finances ground-up construction of 1-8 unit investment properties around Ogden, including spec homes, build-to-rent houses and townhomes, infill duplexes and fourplexes, and small 5-8 unit buildings. Loans are sized on loan-to-cost with terms set per project, and funds are released through a draw schedule after inspections. Plans, permits, budget and builder experience drive approval.

Where building is happening

Most new construction in the Ogden area is west of I-15, where large tracts are being subdivided for single-family homes and townhomes. Builders also put up spec homes in North Ogden and Pleasant View, and infill houses and small multi-unit buildings on lots in central Ogden.

Ogden Valley sees custom mountain homes and cabins, often as second homes or nightly rentals. Those projects deal with county permitting, septic systems, snow loads and access roads, and they take longer to build than a west-side subdivision home.

SettingTypical projectMain issue
West Haven, Plain City, Farr West, HooperSpec homes, townhomes, build-to-rentImpact fees, secondary water, subdivision rules
North Ogden, Pleasant ViewSpec homes on bench lotsSlope, geotechnical review, wildfire
Central Ogden infillSingle-family, duplex, fourplexZoning, older utility lines
Ogden ValleyMountain homes and cabinsCounty permitting, septic, snow load

How loan-to-cost sizing works

We size the loan as a share of total cost: land, hard costs and soft costs such as plans, permits, impact fees, engineering, insurance and interest. Terms are set per project after we review the plans, permits, budget and builder. Land you own can count toward your contribution.

Funds are released through a draw schedule as an inspector confirms each phase. Interest is charged only on drawn funds.

Before closing, we review the contractor's bid against local costs, and the draw schedule is set to match the stages in that bid. Utah requires licensed contractors, so have the license number ready.

Worked example: a build-to-rent fourplex in West Haven

This example is illustrative and not a quote. An investor builds a townhome-style fourplex in West Haven. Land is $180,000, hard costs are $880,000 and soft costs, including impact fees and a secondary water connection, are $120,000, for a total of $1,180,000. At an illustrative 80% loan-to-cost, the loan is $944,000 and the investor contributes $236,000.

If the average drawn balance over a 12-month build is about $519,200, estimated construction interest is about $54,516. When finished, each unit leases for $2,000. If the property appraises at $1,350,000, a DSCR loan at 75% would be $1,012,500, with estimated principal and interest of about $6,907. With taxes of $600 and insurance of $300, DSCR is about 1.02x, just above the 1.0x minimum.

These are planning figures; your bid, budget and inspections set the actual draws. The thin ratio at the end is the real lesson: in Utah, size the project so the permanent loan works before you break ground.

Draw stageAmount
Closing: land$144,000
Foundation$132,000
Framing and roof$220,000
Rough mechanicals$176,000
Drywall and finishes$220,000
Final, site and landscaping$52,000
Total loan$944,000

Impact fees and secondary water

Fast-growing Weber County cities charge impact fees for roads, parks, police, fire, water and sewer, and they can add a significant amount per unit. Many subdivisions also have secondary water, a separate pressurized irrigation system, which may require a connection fee or water shares. Ask each city and water district for a fee schedule before you price the project.

On a multi-unit build, fees are usually charged per unit, so a fourplex pays more than a single-family home on the same lot.

Fees change, often every year, as cities update their capital plans. Lock in the current schedule with the city in writing when you can, and add a cushion in the budget if your permit will be issued after a fee update.

Bench lots and geotechnical reports

Lots on the benches in North Ogden, Pleasant View and the East Bench can sit on slopes with landslide history or near fault zones. Cities often require a geotechnical report before issuing a permit, and the findings can change foundation design and cost. Bench lots can also carry wildfire risk that affects insurance.

On the west side, high groundwater in some areas can limit basements. Soil testing up front avoids surprises.

Utah's construction registry

Utah runs a State Construction Registry where projects are registered and subcontractors and suppliers file preliminary notices to protect their lien rights. A notice of commencement is filed at the start of work. Your title company and general contractor will handle much of this, but make sure lien waivers are collected with each draw.

Winter and snow loads

Ogden winters bring snow and freezing temperatures that slow foundations and exterior work. Most builders aim to have the structure closed in before winter. In Ogden Valley and on higher benches, roofs must be designed for heavier snow loads, which adds cost.

Concrete in deep cold needs heating and blankets, which adds cost, and short days limit working hours. Build the season into your schedule, because delays add interest.

The rental exit

If you plan to hold, the exit is a DSCR loan on the finished property. New townhomes and duplexes on the west side lease well to families and base-related households. Remember that Utah's residential exemption can lower the tax bill on a long-term rental, which helps the ratio. Run the permanent loan numbers before you start; as the example shows, Utah build-to-rent margins can be thin.

Townhome-style fourplexes with garages and private entries are popular on the west side because they lease like single-family homes while sharing one lot and one set of utility connections.

What makes a strong file

Projects without plans or permits, or borrowers with no build experience and no experienced general contractor, usually do not qualify. Have these ready:

A well-organized package shortens our review and helps us set the draw schedule correctly from the start.

Common questions

How are Ogden construction loans sized?

On loan-to-cost, covering land, hard costs and soft costs, with terms set per project.

How are funds released?

Through a draw schedule after each phase is inspected. Interest is charged on drawn funds.

What are impact fees?

City charges for roads, parks, utilities and public safety, usually per unit. Include them in your budget.

What is secondary water?

A separate irrigation system common in Weber County subdivisions. Connections may require fees or water shares.

Do I need a geotechnical report?

Often on bench lots with slopes or landslide history. Cities set the requirement.

What is the State Construction Registry?

Utah's system for project notices and preliminary notices that protect lien rights. Collect lien waivers with each draw.

Do I need building experience?

A build track record or an experienced general contractor is required.

Can I keep the finished property as a rental?

Yes. Refinance into a DSCR loan once it is leased.

Construction loans in UtahConstruction draw schedule calculatorComparing construction lenders in UtahConstruction loansDSCR loans in OgdenSalt Lake City construction loansFourplex investment property loans